Neighbor Prices
Free account. Share a price, unlock everything. Sign up

Electrical Panel Upgrade Cost in Chicago, IL

Based on 9,584 electrical panel upgrade building permits filed in Chicago between 2015 and 2026, the typical declared project value is $3,500, with most landing between $2,500 and $5,500. These are real records from Chicago's public building-permit data, declared job values, not contractor estimates or AI guesses.

Median declared
$3,500
Typical range
$2,500-$5,500
Permits on file
9,584
Years covered
2015-2026

No neighbor receipts in Chicago yet. Paste a quote to see how it compares to these permit values, or add what you paid to start the real price record here.

Electrical Panel Upgrade values over time in Chicago

Median declared value moved from $3,646 in 2021 to $5,000 in 2026, up 37% over that span. Each year below is computed from the filings that actually cleared in Chicago.

2021: $3,646 (801)2022: $4,000 (731)2023: $4,000 (694)2024: $4,600 (761)2025: $5,000 (1,017)2026: $5,000 (517)

Recent electrical panel upgrade permits in Chicago

Actual filings from Chicago's public permit records. Declared job values, not final paid prices.

FiledDeclared valueWork described
2026-06-16 $2,500 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 18 CI
2026-06-16 $6,065 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 38 CI
2026-06-16 $4,000 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 40 CI
2026-06-16 $6,660 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 1 CIR
2026-06-16 $3,541 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 40 CI
2026-06-16 $10,000 LINE VOLTAGE ELECTRICAL WORK. ADD 8 CIRCUITS TO EXISTING 200 AMP SERVICE DISCONNECTING MEA
2026-06-15 $3,000 LINE VOLTAGE ELECTRICAL WORK. ADD 5 CIRCUITS TO EXISTING 200 AMP SERVICE DISCONNECTING MEA
2026-06-15 $6,000 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 1 CIR
2026-06-15 $1,500 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 1 CIR
2026-06-13 $1,500 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 30 CI
2026-06-13 $5,000 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 10 CI
2026-06-12 $5,700 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 1 CIR
2026-06-12 $1,500 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 1 CIR
2026-06-12 $3,000 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 40 CI
2026-06-11 $8,000 LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIR

Paid for electrical panel upgrade in Chicago? Your receipt becomes the first real neighbor price on this page.

Add your price →

How to read these numbers

A permit's declared value is the job cost the owner or contractor stated when they pulled the permit. It tracks the real cost of the work but can run a bit under what was actually paid, since it often leaves out some labor and finish costs. Treat the range as a grounded starting point. What electrical panel upgrade actually costs in Chicago comes down to home size, materials, and scope.

Where this comes from

Every figure is pulled from Chicago's public building-permit records and classified by the work described. Nothing is estimated or AI-generated. How the data works. The moment a Chicago homeowner adds a real receipt, this page upgrades to show what neighbors actually paid next to these permit values.

Paid for electrical panel upgrade in Chicago?

Add what you actually paid. It's anonymous, takes a minute, and turns this permit estimate into a real neighbor price the next homeowner can trust.

Add your price →