EV Charger Installation Cost in Mill Valley, CA
Based on 129 ev charger installation building permits filed in Mill Valley between 2015 and 2026, the typical declared project value is $2,000, with most landing between $1,300 and $3,880. These are real records from Mill Valley's public building-permit data, declared job values, not contractor estimates or AI guesses.
No neighbor receipts in Mill Valley yet. Paste a quote to see how it compares to these permit values, or add what you paid to start the real price record here.
EV Charger Installation values over time in Mill Valley
Median declared value moved from $3,000 in 2019 to $2,087 in 2025, down 30% over that span. Each year below is computed from the filings that actually cleared in Mill Valley.
Recent ev charger installation permits in Mill Valley
Actual filings from Mill Valley's public permit records. Declared job values, not final paid prices.
| Filed | Declared value | Work described |
|---|---|---|
| 2026-04-21 | $2,000 | <span>EV charger and electrical Wiring in EXISTING Out-Building (Shed) in the Backyard, wi |
| 2026-01-23 | $3,000 | -Run new 60 Amp 240V circuit in conduit from main electrical panel to EV charger location |
| 2025-12-29 | $1,000 | Install EV charger |
| 2025-12-07 | $1,000 | Install one new 40A/240V circuit for EV charger and install EV charger configured for 32A |
| 2025-11-20 | $3,100 | Install sub panel in garage. Bypass the main feed land it in sub panel in the garage. Run |
| 2025-10-29 | $6,500 | Remove existing 200A MSP and install new 200A MSP in existing location. Install new ground |
| 2025-10-21 | $3,100 | Install sub panel in garage. Bypass the main feed land it in sub panel in the garage. Run |
| 2025-10-14 | $2,299 | Relocate existing zinsco sub panel to the garage. Adding an EV charger, and three circuit |
| 2025-10-07 | $1,438 | Level 2 EV Charger Installation |
| 2025-10-07 | $1,875 | Add an EV car charger with a NEMA 1450 with GFCI breaker located in garage. |
| 2025-08-12 | $3,550 | Remove existing 100A Zinsco Main Service Panel (MSP) with new 200A Eaton MSP in a new loca |
| 2025-08-07 | $1,300 | Extend existing 220V 40Amp circuit from junction box on exterior of garage via new surface |
| 2025-07-17 | $2,575 | Install 50 amp breaker in sub panel in the laundry room. A load management system will n |
| 2025-06-30 | $1,500 | Install line taps for 50A GFCI breaker for 240V Nema 14-50 outlet for EV charging. |
| 2025-06-09 | $2,500 | Install EV charger |
Paid for ev charger installation in Mill Valley? Your receipt becomes the first real neighbor price on this page.
Add your price →How to read these numbers
A permit's declared value is the job cost the owner or contractor stated when they pulled the permit. It tracks the real cost of the work but can run a bit under what was actually paid, since it often leaves out some labor and finish costs. Treat the range as a grounded starting point. What ev charger installation actually costs in Mill Valley comes down to home size, materials, and scope.
Where this comes from
Every figure is pulled from Mill Valley's public building-permit records and classified by the work described. Nothing is estimated or AI-generated. How the data works. The moment a Mill Valley homeowner adds a real receipt, this page upgrades to show what neighbors actually paid next to these permit values.
Paid for ev charger installation in Mill Valley?
Add what you actually paid. It's anonymous, takes a minute, and turns this permit estimate into a real neighbor price the next homeowner can trust.
Add your price →